The problem
When a contractor fails, the project information often goes with it.
Construction has more insolvencies than any other industry in the UK. Every one can leave a site where nobody has the full picture of what was built, by whom, and with what.
The file is still required
Under the CDM Regulations 2015 the building needs a health and safety file at the end of the project, whoever is left to finish it.
The information is scattered
Drawings, certificates and product data sit with subcontractors, manufacturers, designers and former staff, if they can be found at all.
It holds things up
Missing paperwork can delay a sale, a refinance or handover to the people who will run the building.
Who I work for
The people left holding the site.
Administrators and insolvency practitioners
A complete, indexed record of what exists and what's missing, so the site can be sold or handed on with confidence.
Development and bridging lenders
An independent account of the documentation behind your security, and the files needed to complete and exit.
Developers and incoming contractors
Know what you've inherited before you build on it, and close the job out with a proper handover package.
How it works
Recover, check, then write. Never assume.
01
Review and audit
What you hold across architecture, structure, M&E, fire, specialists and manufacturers.
02
Identify the gaps
Missing, duplicated or unverified information goes on an Outstanding Information Schedule, with who should supply it.
03
Develop the documents
O&M manuals, the health and safety file, registers and schedules, built as the information comes in.
04
Review and hand over
Two consolidated review cycles, then a controlled final issue as indexed, searchable PDFs.
A typical instruction
A finished building with no file behind it.
A funder took control of a residential scheme after the developer went into administration. The building was largely complete, but the health and safety file had never been assembled, and the information was spread across a dozen firms.
I audited what the funder held, chased the rest in batches from the people who had it, and recorded plainly what could not be found. The result was a structured H&S file and O&M manual the new owners could rely on.
Client details are kept confidential.
What you receive
- Project O&M manual: indexed, searchable, bookmarked PDF
- CDM health and safety file: a separate indexed PDF
- Asset register
- Planned preventative maintenance schedule
- Warranty and guarantee register
- Testing and certification register
- As-built and available drawing register
- Outstanding information and gap schedule
Fees
Fixed fee, agreed in writing.
Every site is quoted for its own scope. As a guide, for a mid-sized residential development:
30% on appointment, 40% on draft, 30% on final issue, payable within 30 days. Two review cycles included. Optional site verification visit from £1,200 + VAT.
What this is not
Honest about the gaps.
The documents are compiled from information supplied by the client, design team, contractors and manufacturers. I don't create or certify test results or certificates that haven't been provided by the competent person responsible.
This isn't a health and safety inspection, structural survey or certification of the works. Where something is missing, I say so, and suggest who can supply it.
Taken over a site? Send me what you have.
Tell me about the site and the information you hold, however incomplete. I'll come back with a fixed-fee proposal.