Contractor in administration?

Your contractor has gone. The handover paperwork doesn't have to go with them.

For administrators, lenders and developers left with a part-built or newly finished site. I recover the project information and produce the CDM health and safety file and O&M manuals the building needs. Done remotely, for a fixed fee agreed in writing.

43 years in construction · Former Contracts Manager · CDM Regulations 2015

The problem

When a contractor fails, the project information often goes with it.

Construction has more insolvencies than any other industry in the UK. Every one can leave a site where nobody has the full picture of what was built, by whom, and with what.

The file is still required

Under the CDM Regulations 2015 the building needs a health and safety file at the end of the project, whoever is left to finish it.

The information is scattered

Drawings, certificates and product data sit with subcontractors, manufacturers, designers and former staff, if they can be found at all.

It holds things up

Missing paperwork can delay a sale, a refinance or handover to the people who will run the building.

Who I work for

The people left holding the site.

Administrators and insolvency practitioners

A complete, indexed record of what exists and what's missing, so the site can be sold or handed on with confidence.

Development and bridging lenders

An independent account of the documentation behind your security, and the files needed to complete and exit.

Developers and incoming contractors

Know what you've inherited before you build on it, and close the job out with a proper handover package.

How it works

Recover, check, then write. Never assume.

01

Review and audit

What you hold across architecture, structure, M&E, fire, specialists and manufacturers.

02

Identify the gaps

Missing, duplicated or unverified information goes on an Outstanding Information Schedule, with who should supply it.

03

Develop the documents

O&M manuals, the health and safety file, registers and schedules, built as the information comes in.

04

Review and hand over

Two consolidated review cycles, then a controlled final issue as indexed, searchable PDFs.

A typical instruction

A finished building with no file behind it.

A funder took control of a residential scheme after the developer went into administration. The building was largely complete, but the health and safety file had never been assembled, and the information was spread across a dozen firms.

I audited what the funder held, chased the rest in batches from the people who had it, and recorded plainly what could not be found. The result was a structured H&S file and O&M manual the new owners could rely on.

Client details are kept confidential.

What you receive

  • Project O&M manual: indexed, searchable, bookmarked PDF
  • CDM health and safety file: a separate indexed PDF
  • Asset register
  • Planned preventative maintenance schedule
  • Warranty and guarantee register
  • Testing and certification register
  • As-built and available drawing register
  • Outstanding information and gap schedule

Fees

Fixed fee, agreed in writing.

Every site is quoted for its own scope. As a guide, for a mid-sized residential development:

Information recovery and O&M documentationfrom £5,000
CDM health and safety filefrom £2,250
Totalfrom £7,250 + VAT

30% on appointment, 40% on draft, 30% on final issue, payable within 30 days. Two review cycles included. Optional site verification visit from £1,200 + VAT.

What this is not

Honest about the gaps.

The documents are compiled from information supplied by the client, design team, contractors and manufacturers. I don't create or certify test results or certificates that haven't been provided by the competent person responsible.

This isn't a health and safety inspection, structural survey or certification of the works. Where something is missing, I say so, and suggest who can supply it.